China Cast iron platform installation specification: Level adjustment ±0.02mm/m and foundation embedding technology - China Supplier China Cast iron platform installation specification: Level adjustment ±0.02mm/m and foundation embedding technology - China Supplier China Cast iron platform installation specification: Level adjustment ±0.02mm/m and foundation embedding technology - China Supplier China Cast iron platform installation specification: Level adjustment ±0.02mm/m and foundation embedding technology - China Supplier China Cast iron platform installation specification: Level adjustment ±0.02mm/m and foundation embedding technology - China Supplier

Cast iron platform installation specification: Level adjustment ±0.02mm/m and foundation embedding technology

Price:6522
Industry Category: Measurement-Analysis-Instruments
Product Category:
Brand: 启力
Spec: 3000*5000


Contact Info
  • Add:河北省沧州市泊头市交河镇, Zip:
  • Contact: 谢佳宁
  • Tel:13785751790
  • Email:

Other Products

Description
Additional Information

Cast Iron T-Slot Table Installation Guide: Detailed Steps and Precautions
As a fundamental equipment in industrial production for machining and measurement inspection, the installation quality of the cast iron T-slot table directly affects its subsequent usage accuracy and service life. Improper installation may lead to table deformation, accuracy deviation, and even safety hazards. Therefore, mastering scientific installation steps and precautions is crucial. This article details the installation process and key points of the cast iron T-slot table to help enterprises or operators standardize the installation process and ensure optimal performance of the table.

I. Pre-Installation Preparations
Pre-installation preparations are the foundation for ensuring a smooth installation process and involve three aspects: site, tools, and table inspection.
For the site, choose a flat and solid ground, avoiding soft or easily subsiding areas. If the ground flatness is insufficient, foundation treatment should be carried out in advance, such as pouring a concrete foundation. The foundation thickness should be determined based on the table specifications, generally recommended to be no less than 200mm, and the foundation must be cured to achieve sufficient strength (typically with a curing period of no less than 7 days). Additionally, the site should be away from vibration sources, heat sources, and corrosive substances to provide a stable working environment for the table.
For tool preparation, equip yourself with a level (accuracy no less than 0.02mm/m), shims, wrenches, lifting equipment (such as forklifts or cranes, selected based on the table weight), and cleaning tools (rags, brushes). Among these, the level is a key tool for ensuring the table's flatness and must be calibrated before use to ensure measurement accuracy.
During the table inspection, carefully check the table surface for cracks, dents, or other damage, and ensure there is no debris in the T-slots. If rust is found on the surface, gently remove it with fine sandpaper; debris in the slots should be cleaned with a brush to ensure no impurities affect the installation process. Also, verify that the table's anchor bolt holes align with the预留 holes in the foundation.
II. Detailed Installation Steps
(I) Foundation Treatment and Anchor Bolt Fixing
First, based on the table dimensions and anchor bolt positions, mark the bolt hole locations on the foundation. Use an electric drill to create anchor bolt holes of the appropriate size, with a depth 50-100mm longer than the anchor bolt length and a diameter slightly larger than the bolt diameter (generally 5-10mm larger). Then, place the anchor bolts into the holes and pour concrete to fix them. The concrete strength grade should be no less than C30. After the concrete has solidified (usually requiring more than 24 hours), tighten the bolt nuts to ensure the bolts are secure.
(II) Table Positioning and Preliminary Leveling
Use lifting equipment to slowly hoist the cast iron T-slot table above the foundation, taking care to use special lifting tools to avoid scratches from direct contact between ropes and the table surface. Place the table steadily on the anchor bolts, adjust its position so that the anchor bolts pass through the table's bolt holes, and preliminarily fix the nuts (do not tighten them fully at this stage).
At this point, place the level at different positions on the table's working surface (such as diagonals, midpoints of long sides, etc.) and observe the bubble deviation. Based on the direction of the bubble deviation, insert shims of appropriate thickness between the table bottom and the foundation for preliminary leveling, ensuring the table is roughly level and that all support points bear uniform load.
The installation of a cast iron T-slot table is a detail-oriented task, where every step from preparation to leveling affects the table's performance. Strictly following the above installation steps and paying attention to all precautions not only ensures installation accuracy and extends the table's service life but also provides a reliable foundation for subsequent industrial production. It is hoped that this installation guide will serve as a practical reference for relevant practitioners, enabling the cast iron T-slot table to fully play its important role in machining and measurement inspection under correct installation conditions, thereby helping enterprises improve production efficiency and product quality.
Ms. Xie from Qili Machine Tool 13785751790

Industry Category Measurement-Analysis-Instruments
Product Category
Brand: 启力
Spec: 3000*5000
Stock:
Origin: China / Hebei / Cangzhoushi
About Toocle.com - Partner Programme - Old Version
Copyright © Toocle.com. All Rights Reserved.
(浙)-经营性-2023-0192